Contractors in Miramar, Florida may need to file a Contractor Bond when working on certain types of permitted projects. Such bonds would be the Utility Work in Right of Way Permit Bond, Improvements Bond, Improvements Maintenance Bond, and Lake Excavation Bond.
These bonds are used by the City to protect against a contractor abandoning a project before it's done, skipping on payment of labor and/or materials, or failing to maintain the site of construction (as needed), by providing a means of restitution to those financially harmed.
The price of your Miramar Contractor Bond with Jet starts as low as $100, but actual rates are based on credit; take a look at the chart below to see what rate an application with preferred credit would be approved for.
Bond Limits | Cost |
---|---|
$10,000 | $100 |
$25,000 | $175 |
$50,000 | $250 |
Once you’ve paid for your bond, Jet will mail the original form to you to sign in the presence of a witness. After all signatures have been completed, you will need to send the bond to:
City of Miramar
2200 Civic Center Pl
Miramar, FL 33025
Since there are a few Contractor Bonds that are used by the City of Miramar, here’s a brief rundown of what they are used for:
Utility Work in Right of Way Permit Bond - used for permitted work on utilities (communication facilities) in the public rights of way
Improvements - used for permits for water, sewer, reuse, paving and drainage improvements
Improvements Maintenance - used to insure prompt repair/replacement of damaged or defective subdivision improvements
Lake Excavation - work permit for lake excavation and sloping